ENTER
 
SALES IN SOFIA
STR."CAREVO SELO" 7
COPLETION SCHEDULE:
  1. Outside walls - brick masonry 25sm. with thermal insulation
  2. Walls - mechanically placed gypsum stucco of KNAUF type or pasteboard
  3. Floors - machine cemented putty
  4. Windows - PVC
  5. Entrance door - armored
  6. Rooms doors - MDF panels
  7. Electrical system - to point with individual flat switchboard
  8. Water supply and sewage - to point with water meters
  9. Heating system - central
  10. Facade - decorating color drawn masonry
  11. Roof - bitumen roof-tiles
  12. Main entrance hall of the building - granite grease
  13. Stairs - polish natural stone, color latex
  14. Yard lighting system and green areas - in accordance with project of vertically planning
  15. Lift - with machine room downstairs, hydraulic

Upcoming construction
Designed by: Market.BG